Palm Beach Gardens Emergency Operations & Communications Center
Project Description Our team has prepared drainage, grading, paving, wastewater collection, and water distribution construction drawings for this design-build project…
Project Description Our team has prepared drainage, grading, paving, wastewater collection, and water distribution construction drawings for this design-build project…
Project Description This project includes the design of right-of-way improvements including curb and gutters, driveway culverts and swale regrading. The…
Project Description Engenuity Group, Inc. prepared the contract documents, administered bidding, observed construction, and administered the construction contract for replacement…
Project Description During a heavy rain event on May 23 and 24, 2009, twin 36” metal culverts leading from the…
Project Description As District Engineer for Indian Trail Improvement District from 1991-2003, Engenuity Group was responsible for the design and…
Project Description Engenuity Group professional services consisted of a topographic survey, preparation of design and construction documents. The project consisted…
Project Description Engenuity Group professional services consisted of a topographic survey, preparation of design documents, bidding, contract administration, construction observation,…
Project Description Florida Crystals called upon Engenuity Group to help analyze the cause of a major roadside sinkhole along SR…
Project Description Coventry Lane and Ryder Cup Boulevard drainage improvements and roadway resurfacing included design, permitting, construction observation, and construction…