Project Description
This project involved the stabilization around and beneath 16 bridges (at 13 individual sites) within Village limits. We have provided topographic surveys that included six canal cross sections at each corner of the bridge and soundings had to be taken across canals. The topographic data we’ve produced contained abutment wing walls, piers (columns), embankments, sidewalks & bridge decking at each corner of bridges.