Palm Beach Habilitation Center – Watermain, Forcemain and Lift Station

Project Description

Engenuity Group was contracted by the Palm Beach Habilitation Center (Hab Center) in 2016 to perform complete design services for a new potable water main, a privately maintained lift station and force main that will service the residence under their control located at 5203 Colbright Road. The Hab Center was approved for a grant by the Federal Government for this project which Engenuity Group provided a study to help them obtain in 2012.

The water main connection will be made at the terminus of an existing 8” line on the east side of Colbright Road, approximately 1000 feet north of Lantana Road. The force main connection will be made at the terminus of an existing 4” line located on a church property on the corner of Lantana Road and Fearnley Road.

Engenuity Group, Inc. performed a route survey of the proposed water and force main along Colbright Road, approximately 3,400 linear feet, which included all topography and information such as cross sections of the LWDD canal east and west of Colbright Road.

Other work includes the preparation of construction documents, permit application submittals, bid coordination, construction observations and construction contract administration with the GC selected to build the pipeline and lift station.

 

Back To Top